Piping

Industrial Process and Field Piping Services: The Flawlessly Functioning Veins of Your Facility

If process equipment is the heart of an industrial facility, its veins are the complex piping networks connecting this equipment. As DRS Makina, we offer industrial field piping services in petrochemical, energy, water treatment, and food facilities, tailored to the physical and chemical properties of the fluid and resistant to high pressures and temperatures. We carry out on-site fabrication and installation with strict adherence to international codes (ASME B31.1, ASME B31.3, EN 13480) and P&ID isometric drawings, adopting the “Zero Leakage” principle.

Our Comprehensive Piping and Integration Solutions With our operational strength in the field and our experienced engineering team, we flawlessly execute the fabrication and on-site installation of the following lines, regardless of the project’s scale:

  • Heavy Industry Pipe Racks: Fabrication of massive steel pipe racks that span wide distances inside or outside the factory, carrying dozens of different lines simultaneously, laying of insulated lines, and their field installation.
  • Pump Stations and Valve Groups: Integration of industrial pumps, heavy-duty valves (gate, globe, butterfly), and control instruments into the system, and the execution of leak-tight flange connections.
  • Energy and Cogeneration Plant Piping: Critical energy lines installed between gas engines (e.g., Jenbacher), cooling towers, steam boilers, and heat exchangers, complete with high temperature/pressure insulation (cladding).
  • Complex Manifold Systems: On-site construction of spherical or cylindrical manifold networks requiring specialized welding craftsmanship, ensuring the distribution or collection of fluid to/from multiple lines.
  • Process and Storage Tank Piping: Secure connection of stainless steel (304L, 316L) or carbon steel process lines with storage tanks, silos, and separators.

Certified On-Site Welding and Advanced Quality Control The welding quality in pipelines directly determines the overall safety of the facility. All welding operators within DRS Makina site teams are certified according to EN and ASME norms. TIG, Argon, and Electrode welding applications are meticulously performed on-site. Before commissioning, all installed pipelines are approved through non-destructive testing (Radiographic Testing/RT, Ultrasonic Testing/UT) and hydrostatic tests above the operating pressure, and are handed over together with their isometric projects.